The rural door handles PH1920 on square rosettes in matt white bronze (WBS).
As its name suggests, this handle was created around 1920 during the height of the Bauhaus period.
Nostalgic door handles that still fit perfectly in a modern interior? That's the Bauhaus door fitting! The rectangular shapes ensure a sleek design and simplicity.
These door handles in matt white bronze come from the Pure collection by Dauby and are mounted on 50mm square rosettes.
The door handles are supplied as a pair including 8x8mm pin and mounting materials.
Matching key plates or toilet fittings can be found below under related products.






