Best prices guaranteed
Money back guarantee
Largest range in Europe
EUR
Dauby

Security set TOP + 2017 matt white bronze (WBS) - 72 - 92 - 110mm

Add to wishlist
€396,49 €479,75 Incl. tax Per pair
Free shipping
- +
Delivered in: 4-5 days
Europe-wide shipping
Money back guarantee
For private and professional customers
Become a business customer and take advantage of special purchase prices! Click here to request an account.
Description Narrow shield security set in matte white bronze that is composed with 1 fixed knob and 1 x door handle PH2017. Possible PZ axle sizes of 72, 92 or 110mm
Article code: 17060
Extra narrow security fittings that fit on any door, including doors with a narrow profile.
 
Thanks to the standard dimensions of the axle size, namely 72mm-92mm-110mm, your current fittings can be replaced without any problems.
 
This model is equipped with a narrow shield of 250x30mm and is available with a PZ axle size of 72, 92 or 110mm. You can select the desired axle size (72, 92 or 110mm) in the scroll menu above.
 
The security fitting in matt white bronze has a fixed knob on the outside and a Pure® PH1925+ door handle on the inside. The handle and knob can be adjusted for left or right opening doors.
 
These silver-coloured safety fittings are not sprung and are supplied with mounting materials. The national security fittings are suitable for three-point locks.
 
Reviews Read or write a review No reviews found Add your review
Categories
Door handles Door fittings Hinges Furniture handles Door handles Window handles Espagnolettes Doorknobs Door stoppers Security hardware Locks Cylinders Door closers / door pumps
Door closers / door pumps
Back to categories Door closers
Sliding door shells House numbers Sliding door systems Portholes Door latches Pictograms Mailboxes Doorbell Pushers Kitchen accessories Interior finish Coat racks & hooks Handrail holders Door catchers Storm chains Shelf supports Magnetic snappers Safes Bathroom and toilet accessories APRILE DESIGN FORMANI LOCINOX Kit / Glue / PUR/Spray PROJECT DEALS Special offers New products Accessories Gift cards Stock Deals Sale Brands About us Customer service My account EURUSD Nederlands Deutsch English Français