This furniture handle in matt white bronze is a Pure® design. They have been inspired by the 'Chemin de Fer' model, but in the sleek version. one of the great assets of the Pure® collection is the Originality.
The 190mm stick seems to float on the feet that are 128mm apart. This ensures a unique design. The handle is 37 mm forward. The PMT handles can be supplied in 6 different versions, namely aged iron, raw metal, raw bronze, polished rough bronze, white bronze and matt white bronze.
This PMT furniture handle in matt white bronze comes from the Pure® collection by Dauby and is supplied per piece including mounting material (2 x M4).
This model is also available as a button with which you can combine them very nicely. (See the PTT series)









