This T-model furniture handle in matt white bronze is a Pure® design. They have been inspired by the 'Chemin de Fer' model, but in the sleek version. Originality is one of Pure®'s strengths.
The 60 mm stick seems to float on the 10x10 mm base, which creates a unique design. The handle is 36 mm forward. The knobs can be supplied in 6 different versions, ie aged iron, raw metal, raw bronze, polished raw bronze, white bronze and matt white bronze.
This furniture handle from the Pure® collection by Dauby in matt white bronze is supplied per piece including mounting material (1 x M4). This model is also available as a handle.









