Best prices guaranteed
Money back guarantee
Largest range in Europe
EUR
Dauby

Dauby Pure BB key rosette 1925 – matte Satin white bronze (WBS)

Add to wishlist
€47,42 €57,38 Incl. tax Per pair
- +
Delivered in: 4-5 days
Europe-wide shipping
Money back guarantee
For private and professional customers
Become a business customer and take advantage of special purchase prices! Click here to request an account.
Description Dauby Pure BB key rosette 1925 – matte white bronze (WBS)
Article code: 15082-2

The Dauby BB rosette 1925 is a stylish key rosette from the Pure® collection and forms the perfect complement to door handles from the same range. This rosette is designed for interior doors with a classic key lock (BB) and ensures a neat and authentic finish around the keyhole.

The design of the 1925 series is inspired by historical models and complements classic, country, and modern interiors perfectly. The understated and timeless design makes this rosette a versatile choice for various living styles.

The Matte White Bronze (WBS) version is a matte variant of white bronze. The base material is solid bronze, but instead of being polished, the surface undergoes a special treatment in which it is tumbled and hand-finished. This creates a subtle matte patina with a soft, silvery tint.

The rosette is supplied in pairs and can be perfectly combined with matching door handles and accessories from the Dauby Pure® collection.

Brand Dauby
Collection Pure
Model 1925
Product type BB key rosette
Delivery Per pair
Application Interior doors with key lock
Material Solid bronze
Finish Matte white bronze (WB)
Form Around
Diameter 50 mm
Thickness 10 mm
Style Classic / country / industrial
Inclusive Fastening material
Reviews Read or write a review No reviews found Add your review
Categories
Door handles Door fittings Hinges Furniture handles Door handles Window handles Espagnolettes Doorknobs Door stoppers Security hardware Locks Cylinders Door closers / door pumps
Door closers / door pumps
Back to categories Door closers
Sliding door shells House numbers Sliding door systems Portholes Door latches Pictograms Mailboxes Doorbell Pushers Kitchen accessories Interior finish Coat racks & hooks Handrail holders Door catchers Storm chains Shelf supports Magnetic snappers Safes Bathroom and toilet accessories APRILE DESIGN FORMANI LOCINOX Kit / Glue / PUR/Spray Volume discounts Special offers New products Accessories Gift cards Stock Deals Sale Brands About us Customer service My account EURUSD Nederlands Deutsch English Français