Best prices guaranteed
Money back guarantee
Largest range in Europe
EUR
Dauby

Dauby Pure PZ cylinder rosette 50F – matte Satin white bronze (WBS)

Add to wishlist
€30,42 €36,81 Incl. tax Per pair
- +
Delivered in: 4-5 days
Europe-wide shipping
Money back guarantee
For private and professional customers
Become a business customer and take advantage of special purchase prices! Click here to request an account.
Description Dauby Pure PZ cylinder rosette 50F – matte white bronze (WBS)
Article code: 17100-2

The Dauby PZ rosette 50F is a sleek and minimalist cylinder rosette from the Pure® collection. This rosette is used on doors with a cylinder lock (PZ) and provides a subtle and stylish finish around the profile cylinder.

The 50F rosette distinguishes itself with its ultra-flat and minimalist design. Without extra edges or details, a clean and modern look is created that fits perfectly within both contemporary and classic interiors.

The Matte White Bronze (WBS) finish is crafted from solid bronze and features an elegant, matte, silvery tint. Unlike polished white bronze, this finish is tumbled and hand-finished, creating a subtle matte patina and a refined appearance.

This cylinder rosette is suitable for doors with a standard DIN distance of 38 mm (PC 38) , which is common for interior doors with a cylinder lock.

At Deurklinkenshop, this rosette is supplied as a set of 2 (per pair) , ensuring both sides of the door are neatly finished. The rosette combines perfectly with door handles from the Dauby Pure® collection.

Brand Dauby
Collection Pure
Model 50F
Product type PZ cylinder lock
Delivery Per pair
Application doors with cylinder lock
Material Solid bronze
Finish Matte bronze (WBS)
Form Around
Diameter 50 mm
Thickness 4 mm
Style Modern / minimalist / classic
Inclusive Fastening material

 

Reviews Read or write a review No reviews found Add your review
Categories
Door handles Door fittings Hinges Furniture handles Door handles Window handles Espagnolettes Doorknobs Door stoppers Security hardware Locks Cylinders Door closers / door pumps
Door closers / door pumps
Back to categories Door closers
Sliding door shells House numbers Sliding door systems Portholes Door latches Pictograms Mailboxes Doorbell Pushers Kitchen accessories Interior finish Coat racks & hooks Handrail holders Door catchers Storm chains Shelf supports Magnetic snappers Safes Bathroom and toilet accessories APRILE DESIGN FORMANI LOCINOX Kit / Glue / PUR/Spray Volume discounts Special offers New products Accessories Gift cards Stock Deals Sale Brands About us Customer service My account EURUSD Nederlands Deutsch English Français