DAUBY kitchen and bathroom accessories
Beautiful towel ring in matt white bronze (WBS) on a round rosette for a stylish kitchen or bathroom. Combine this hook with other items from the Pure® Plus collection to give your kitchen or bathroom a timeless and refined look.
| base material | white bronze |
| colour | matt silver (Old silver) |
| total height | 193 mm |
| diameter ring | 170 mm |
| diameter rosette | 50 mm |
| depth | 66 mm |
| collection / brand | Pure® Plus / Dauby |
| distance drill holes | 44 mm |
| mounting material | included |
Why choose Dauby?
Dauby is a renowned brand known for its high-quality fittings and rural designs.
1. Authentic and timeless design
Dauby products are often manufactured using traditional methods such as sand casting, which provides an authentic look that complements both classic and modern interiors.
2. High-quality materials and unique discoloration
Made from durable materials such as bronze and cast iron, Dauby products not only offer long-lasting quality, but also a unique natural patina. This aging makes each product more beautiful as it is used.
3. Wide range
From door handles to furniture pulls, Dauby offers an extensive collection that fits together perfectly. This makes it easy to achieve a consistent interior design.
4. Environmental friendliness
Dauby attaches great importance to environmentally friendly production. Traditional techniques have a lower impact on the environment, and the materials are recyclable.
Why buy 'DAUBY' at Deurklinkenshop?
Deurklinkenshop.be is the specialist for high-quality fittings, and with DAUBY you choose a unique combination of authenticity, quality and style. We offer an extensive range of Dauby products, available directly from stock. Thanks to our fair prices, fast delivery and excellent service, you are assured of a problem-free purchasing experience.
By choosing Dauby at deurklinkenshop.be you choose country-style fittings that are not only functional, but also give your interior a unique, stylish and sustainable look.







