The design of this furniture handle is based on the butterfly furniture knob
Despite the fact that it gives the impression of having a casual shape, it gives every piece of furniture an unmistakably strong cachet. The handle is particularly notable for its unique, incomparable design.
With the butterfly line you can harmonize your interior completely from your front door to your furniture knob. This handle in matt white bronze is available in three sizes (ash sizes 96, 128 and 224) and 6 different colours.
This model has an axle size of 128 mm (PMBU128) and a total width of 184 mm.
This handle in matt white bronze comes from the Pure® collection by Dauby and is supplied per piece including mounting materials (2 x M4)






