Description
DAUBY letterbox exterior flap from the Pure collection in Matte White Bronze (WBS). For a stylish and neat finish to the exterior of the front door.
Article code: 15860
DAUBY mailbox outer flap - White Bronze (WB)
This DAUBY letterbox exterior flap from the Pure collection provides a stylish finish to the exterior of the front door. The White Bronze (WB) version has a dark, characterful appearance that complements other door hardware in the same finish beautifully.
The outer flap has total dimensions of 332 x 82 mm and features a movable flap that neatly closes the letterbox opening. Thanks to its understated, rectangular design, the letterbox can be beautifully combined with front door handles, security fittings, and other hardware from the Pure collection.
This exterior flap makes a beautiful combination with the matching DAUBY letterbox inner plate with brush , which is mounted on the inside of the door. Both parts are sold separately.
Technical specifications
| Brand | DAUBY |
| Collection | Pure |
| Product type | Letterbox outer flap |
| Finish | White Bronze (WB) |
| Total dimensions | 332 x 82 mm |
| Center distance mounting | 300 mm |
| Plate thickness | 12 mm |
| Assembly | Outside of the door |
| Unit | Per piece |









