Best prices guaranteed
Money back guarantee
Largest range in Europe
EUR
Dauby

Pair of Dauby door handles PH1925+/P40 matt white bronze (WBS) on plate

Add to wishlist
€223,42 €270,34 Incl. tax Per pair
Free shipping
- +
Delivered in: 4-5 days
Europe-wide shipping
Money back guarantee
For private and professional customers
Become a business customer and take advantage of special purchase prices! Click here to request an account.
Description Rural matt white bronze door handles in PH1925/P40 version on long plates of 250x40mm, available blind, with keyhole or cylinder recess.
Article code: DS15043

Bring timeless elegance to your interior with the PH1925+/P40 door handle, a 1925 design inspired by the iconic style of Bauhaus architect Ferdinand Kramer. With its conical shape and minimalist appearance, this door handle in matt white bronze (WBS) exudes pure class.

The sleek, simple lines create a subtle yet powerful look that fits perfectly in both modern and classic interiors. Thanks to the artisanal production, this model retains a retro look, while the refined design effortlessly fits in with contemporary living styles.

This version is supplied on a Pure® long shield, which ensures a seamless finish without visible openings.

The door handles are available on a blind shield or in the axle sizes 72mm, 92mm and 110mm with key or cylinder opening. Make your choice in the scroll menu at the top right.

Dauby is known for its handmade door handles and fittings in authentic materials, with a unique, timeless and artisanal look.

Choose the PH1925+/40 door handles in matt white bronze (WBS) and add a touch of Bauhaus mastery to your interior!

The door handles are supplied as a set including mounting materials.

Reviews Read or write a review No reviews found Add your review
Categories
Door handles Door fittings Hinges Furniture handles Door handles Window handles Espagnolettes Doorknobs Door stoppers Security hardware Locks Cylinders Door closers / door pumps Sliding door shells House numbers Sliding door systems Portholes Door latches Pictograms Mailboxes Doorbell Pushers Kitchen accessories Interior finish Coat racks & hooks Handrail holders Door catchers Storm chains Shelf supports Magnetic snappers Safes Bathroom and toilet accessories APRILE DESIGN FORMANI LOCINOX Kit / Glue / PUR/Spray PROJECT DEALS Special offers New products Accessories Gift cards Sale Brands About us Customer service My account EURUSD Nederlands Deutsch English Français