Best prices guaranteed
Money back guarantee
Largest range in Europe
EUR
X7.ZO

Single stainless steel door handle Z41 WBS - Oak / Black - 30/80/500mm

Add to wishlist
€123,97 €97,52 €118,00 Incl. tax per piece
Choose the desired mounting set here:
Single blind mounting (Ø10mm x 55mm) - PVC, ALU (G1)
+ €6,00
One-sided invisible fixing - Wood (G6)
+ €7,50
Single through mounting (Ø8mmx100mm) - Wood, PVC, ALU (G3)
+ €9,00
Single through mounting - Glass (G5)
+ €9,00
Pairwise continuous mounting (Ø8mm x 90mm)- Wood, PVC, ALU (G2)
+ €9,00
Pairwise continuous mounting - Glass (G4)
+ €9,00
Without fastening - (G0)
+ €0,00
Stainless steel rings for mounting where the holes do not completely match - (P2)
+ €4,00
Stainless steel rings for mounting where the holes do not completely match - (P1)
+ €4,00
- +
Delivered in: 2-4 weeks
Europe-wide shipping
Money back guarantee
For private and professional customers
Become a business customer and take advantage of special purchase prices! Click here to request an account.
Description Single black door handle combined with wood that is suitable for indoor & outdoor use. Suitable for glass doors, regular doors, PVC and ALU doors.
Article code: DKSZ41 WBS-1

This beautiful door handle, which is produced in Europe, is a combination of black and oak.

The wooden part is provided with a protective oil up to 3 times, which ensures a long lifespan for the wood. The door handle itself is made of stainless steel and is finished with an anodized black coating with a fine structure. The base itself consists of aluminum, it has 2 mounting points which provides extra strength (distance between the 2 mounting points is 80mm).

This designer door handle is suitable for indoors and outdoors and is supplied per piece.

Because every door requires a different confirmation, you must select the desired confirmation above in the drop-down menu. If you want paired door handles, order this door handle twice together with the desired mounting.

To maintain the beautiful look of the wood, we recommend re-oiling the door handles every 1.5 to 2 years.

Deurklinkenshop is the exclusive distributor of X7.ZO, would you like to benefit from our special conditions for resellers? Call us and ask about the possibilities.

door handle material Stainless steel
bracket material aluminium
color bracket matt black (anodized), fine structure
axle size (mm) 80
total length (mm) 500
foot dimensions 100x28
unit piece
application inside & outside
drill diameter glass 10mm
drill diameter wood, PVC, aluminum 12mm
mounting material glass and wood not included (select separately)
Reviews Read or write a review No reviews found Add your review
Categories
Door handles Door fittings Hinges Furniture handles Door handles Window handles Espagnolettes Doorknobs Door stoppers Security hardware Locks Cylinders Door closers / door pumps
Door closers / door pumps
Back to categories Door closers
Sliding door shells House numbers Sliding door systems Portholes Door latches Pictograms Mailboxes Doorbell Pushers Kitchen accessories Interior finish Coat racks & hooks Handrail holders Door catchers Storm chains Shelf supports Magnetic snappers Safes Bathroom and toilet accessories APRILE DESIGN FORMANI LOCINOX Kit / Glue / PUR/Spray Volume discounts Special offers New products Accessories Gift cards Stock Deals Sale Brands About us Customer service My account EURUSD Nederlands Deutsch English Français