Best prices guaranteed
Money back guarantee
Largest range in Europe
EUR
Dauby

Dauby Pure® PH2017-50F door handle on rosette in matt white bronze (WBS)

Add to wishlist
€181,82 €220,00 Incl. tax Per pair
Free shipping
- +
Delivered in: 4-5 days
Europe-wide shipping
Money back guarantee
For private and professional customers
Become a business customer and take advantage of special purchase prices! Click here to request an account.
Description Timeless matt white bronze door handle PH2017 by Belgian designer Tom Lenaerts
Article code: 16870

The Dauby PH2017-50F door handle from the Pure® collection is a timeless and stylish design by Belgian interior architect Tom Lenaerts. Combining modern design with traditional craftsmanship, this door handle makes an elegant addition to both modern and classic interiors.

Developed in 2017, the design features a simple, minimalist aesthetic. Thanks to its simple lines and balanced proportions, this door handle fits effortlessly into a variety of interior styles, from modern and industrial to rustic and classic.

Each Dauby door handle is handcrafted using the traditional sand casting process. The metal is poured into sand molds and then finished by hand. This creates a subtle texture and small surface imperfections, giving each piece a unique character.

The Matte White Bronze (WBS) finish gives the door handle an elegant look. The matte silvery hue creates a subtle and refined look.

Thanks to its timeless design and high-quality finish, this Dauby door handle is a perfect choice for those looking for stylish and durable door fittings.

Brand Dauby
Model PH2017-50F
Collection Pure®
Type Door handle
Delivery Per pair
Designer Tom Lenaerts
Material Metal alloy
Finishing Matte white bronze (WBS)
Assembly On rosette
Diameter rosette 50 mm
Length of stool approx. 122 mm
Pin size 8 x 8 mm
Application Interior and exterior doors
Reviews Read or write a review No reviews found Add your review
Categories
Door handles Door fittings Hinges Furniture handles Door handles Window handles Espagnolettes Doorknobs Door stoppers Security hardware Locks Cylinders Door closers / door pumps Sliding door shells House numbers Sliding door systems Portholes Door latches Pictograms Mailboxes Doorbell Pushers Kitchen accessories Interior finish Coat racks & hooks Handrail holders Door catchers Storm chains Shelf supports Magnetic snappers Safes Bathroom and toilet accessories APRILE DESIGN FORMANI LOCINOX Kit / Glue / PUR/Spray PROJECT DEALS Special offers New products Accessories Gift cards Sale Brands About us Customer service My account EURUSD Nederlands Deutsch English Français