Best prices guaranteed
Money back guarantee
Largest range in Europe
EUR
Dauby

Dauby Pure door handle PH1830 / 50R on round rosette – matte white bronze (WBS)

Add to wishlist
€132,10 €159,84 Incl. tax Per pair
Free shipping
- +
Delivered in: 4-5 days
Europe-wide shipping
Money back guarantee
For private and professional customers
Become a business customer and take advantage of special purchase prices! Click here to request an account.
Description Dauby Pure door handle PH1830 / 50R on round rosette – matte white bronze (WBS)
Article code: 15002

The Dauby PH1830 door handle from the Pure® collection is an authentic door handle with a historically inspired design. The model was found in homes from the early 19th century and combines a classic form with a sleek and timeless character. As a result, this door handle fits perfectly in interiors with retro, industrial, or country accents.

The Matte White Bronze (WBS) version is a matte variant of the white bronze finish. With this finish, the bronze is not polished, but tumbled in a special way and then finished by hand. This creates a subtle matte patina that provides an elegant and calm appearance.

The door handle is supplied in pairs and mounted on a round rosette with a diameter of 50 mm. Thanks to its solid construction, the handle lies firmly in the hand and gives every door a high-quality and durable finish.

You can find matching key plates, cylinder plates, or toilet fittings below under related products.

Brand Dauby
Collection Pure
Model PH1830 / 50R
Product type Door handle / door knob
Delivery Per pair
Material Solid bronze
Finishing Matte white bronze
Rosette Around
Rosette diameter Ø 50 mm
Pen size 8 x 8 mm
Suitable for door thickness approx. 40 mm
Application Interior doors
Style Classic / country / industrial
Inclusive Mounting material
Reviews Read or write a review No reviews found Add your review
Categories
Door handles Door fittings Hinges Furniture handles Door handles Window handles Espagnolettes Doorknobs Door stoppers Security hardware Locks Cylinders Door closers / door pumps Sliding door shells House numbers Sliding door systems Portholes Door latches Pictograms Mailboxes Doorbell Pushers Kitchen accessories Interior finish Coat racks & hooks Handrail holders Door catchers Storm chains Shelf supports Magnetic snappers Safes Bathroom and toilet accessories BUSTER+PUNCH APRILE DESIGN FORMANI HALCÖ X7.ZO LOCINOX Kit / Glue / PUR/Spray PROJECT DEALS Special offers New products Accessories Gift cards Sale Brands About us Customer service My account EURUSD Nederlands Deutsch English Français