Description
Narrow matt white bronze security fitting with a door handle Pure® PHL combined with a door handle Pure® PHT. PZ axle size of 72, 92 or 110mm possible
Article code: 15153
This extra narrow security fitting fits on every door, including doors with narrow profiles.
Thanks to the standard dimensions of the axle size, namely 72mm-92mm-110mm, your current fittings can be replaced without any problems.
The narrow shield of this model is 250x30mm and available with the standard PZ axle sizes of 72, 92 or 110mm. You can select the desired axle size (72, 92 or 110mm) in the scroll menu above.
This matt white bronze security fitting combines a Pure® PHL with a T-shaped PHT door handle, which gives the fitting something extra. The handles can be adjusted for both left and right opening doors.
These silver-coloured safety fittings are not sprung and are supplied with mounting materials. The national security fittings are suitable for three-point locks.









