Best prices guaranteed
Money back guarantee
Largest range in Europe
EUR
Dauby

DAUBY CAST door handles on round rosette – Matte White Bronze (WBS)

Add to wishlist
€174,56 €211,22 Incl. tax Per pair
Free shipping
- +
Delivered in: 4-5 days
Europe-wide shipping
Money back guarantee
For private and professional customers
Become a business customer and take advantage of special purchase prices! Click here to request an account.
Description Door handles from the DAUBY CAST collection by Nicholas Erreweyaert, finished in Matte White Bronze (WBS) and supplied per pair.
Article code: 27982

DAUBY CAST door handles – Matte White Bronze (WBS)

The DAUBY CAST door handles in Matte White Bronze (WBS) were designed by Nicholas Erreweyaert and are inspired by the robust appearance of cast tools. The design is solid and tactile, without superfluous lines, giving the door handles a powerful yet calm character.

The rounded shape ensures a comfortable grip, while the recessed surface in the handle emphasizes the artisanal character of the CAST collection. The Matte White Bronze (WBS) finish has a soft, matte appearance and gives the door handles a refined and timeless character.

The door handles are supplied as a pair and feature round rosettes with a diameter of 50 mm. Thanks to the matte bronze finish and timeless design, this version fits perfectly into both modern and characterful interiors.

Technical specifications

Brand DAUBY
Collection CAST
Model PHCAST /50F
Product type Door handles on round rosette
Designer Nicholas Erreweyaert
Colour Matte White Bronze
Color code WBS
Rosette Around
Rosette diameter 50 mm
Door handle length 142 mm
Door handle width 25 mm
Door handle thickness 10 mm
Total excellence 56 mm
Unit Per pair
Reviews Read or write a review No reviews found Add your review
Categories
Door handles Door fittings Hinges Furniture handles Door handles Window handles Espagnolettes Doorknobs Door stoppers Security hardware Locks Cylinders Door closers / door pumps Sliding door shells House numbers Sliding door systems Portholes Door latches Pictograms Mailboxes Doorbell Pushers Kitchen accessories Interior finish Coat racks & hooks Handrail holders Door catchers Storm chains Shelf supports Magnetic snappers Safes Bathroom and toilet accessories APRILE DESIGN FORMANI LOCINOX Kit / Glue / PUR/Spray PROJECT DEALS Special offers New products Accessories Gift cards Sale Brands About us Customer service My account EURUSD Nederlands Deutsch English Français