Best prices guaranteed
Money back guarantee
Largest range in Europe
EUR
Dauby

DAUBY CAST furniture knob PCAST-60 – Matte White Bronze (WBS) – 60 mm

Add to wishlist
€69,86 €84,53 Incl. tax
- +
Delivered in: 4-5 days
Europe-wide shipping
Money back guarantee
For private and professional customers
Become a business customer and take advantage of special purchase prices! Click here to request an account.
Description Furniture knob from the DAUBY CAST collection by Nicholas Erreweyaert, finished in Matte White Bronze (WBS) with a height of 25 mm
Article code: 28831

DAUBY CAST furniture knob PCAST-60 – Matte White Bronze (WBS)

The DAUBY CAST PCAST-60 furniture knob in Matte White Bronze (WBS) was designed by Nicholas Erreweyaert and aligns with the robust and tactile character of the CAST collection. The simple, rounded shape creates a powerful design without superfluous lines.

With its generous diameter of 60 mm , the PCAST-60 forms a striking detail on cabinets, drawers, and other pieces of furniture. The finish in Matte White Bronze (WBS) has a soft, matte appearance and gives the design a refined and timeless character.

The furniture knob has a total height of 45 mm and is supplied individually . The knob features M4 thread for mounting.

Technical specifications

Brand DAUBY
Collection CAST
Model PCAST-60
Product type Furniture knob
Designer Nicholas Erreweyaert
Colour Matte White Bronze
Color code WBS
Knob diameter 60 mm
Total height 45 mm
Knob thickness 15 mm
Neck diameter 28 mm
Confirmation M4
Unit Per piece
Reviews Read or write a review No reviews found Add your review
Categories
Door handles Door fittings Hinges Furniture handles Door handles Window handles Espagnolettes Doorknobs Door stoppers Security hardware Locks Cylinders Door closers / door pumps
Door closers / door pumps
Back to categories Door closers
Sliding door shells House numbers Sliding door systems Portholes Door latches Pictograms Mailboxes Doorbell Pushers Kitchen accessories Interior finish Coat racks & hooks Handrail holders Door catchers Storm chains Shelf supports Magnetic snappers Safes Bathroom and toilet accessories APRILE DESIGN FORMANI LOCINOX Kit / Glue / PUR/Spray Volume discounts Special offers New products Accessories Gift cards Stock Deals Sale Brands About us Customer service My account EURUSD Nederlands Deutsch English Français