DAUBY CAST furniture knob PCAST – Matte White Bronze (WBS)
The DAUBY CAST PCAST furniture knob in Matte White Bronze (WBS) was designed by Nicholas Erreweyaert and references the robust appearance of cast tools. The design is solid and tactile, without superfluous lines, and aligns perfectly with the character of the CAST collection.
The rounded shape fits comfortably in the hand and gives the furniture knob its calm yet distinctive appearance. The Matte White Bronze (WBS) finish has a soft, matte look and lends the design a refined and timeless character.
This furniture knob is available in two sizes: 25 mm and 37 mm . The desired size can easily be selected via the selection menu for the product. Both versions have a diameter of 20 mm and feature M4 thread for mounting. The furniture knob is supplied individually.
Technical specifications
| Brand | DAUBY |
| Collection | CAST |
| Model | PCAST |
| Product type | Furniture knob |
| Designer | Nicholas Erreweyaert |
| Colour | Matte White Bronze |
| Color code | WBS |
| Diameter | 20 mm |
| Available sizes | 25 mm and 37 mm |
| Confirmation | M4 |
| Unit | Per piece |







