Best prices guaranteed
Money back guarantee
Largest range in Europe
EUR
Dauby

DAUBY CAST window handle PHCAST/DKS lockable – Matte White Bronze (WBS)

Add to wishlist
€196,20 €237,40 Incl. tax per piece
Free shipping
- +
Delivered in: 4-5 days
Europe-wide shipping
Money back guarantee
For private and professional customers
Become a business customer and take advantage of special purchase prices! Click here to request an account.
Description Lockable window handle from the DAUBY CAST collection by Nicholas Erreweyaert, finished in Matte White Bronze (WBS)
Article code: 28070

DAUBY CAST window handle PHCAST/DKS lockable – Matte White Bronze (WBS)

The DAUBY CAST PHCAST/DKS window handle in Matte White Bronze (WBS) was designed by Nicholas Erreweyaert and references the robust appearance of cast tools. The design is solid and tactile, without superfluous lines, and aligns perfectly with the character of the CAST collection.

The rounded shape fits comfortably in the hand and gives the window handle its calm yet distinctive appearance. The Matte White Bronze (WBS) finish has a soft, matte look and gives the design a refined and timeless character.

This version is lockable with a key , allowing the window to be locked after closing. The window handle is supplied individually and features a 7 mm square spindle.

Technical specifications

Brand DAUBY
Collection CAST
Model PHCAST/DKS
Product type Window handle
Execution Lockable with key
Designer Nicholas Erreweyaert
Colour Matte White Bronze
Color code WBS
Total height 153 mm
Width 35 mm
Handle length 117 mm
handle width 25 mm
Total excellence 82 mm
Pen 7 x 7 mm
Mounting distance 43 mm
Unit Per piece
Reviews Read or write a review No reviews found Add your review
Categories
Door handles Door fittings Hinges Furniture handles Door handles Window handles Espagnolettes Doorknobs Door stoppers Security hardware Locks Cylinders Door closers / door pumps Sliding door shells House numbers Sliding door systems Portholes Door latches Pictograms Mailboxes Doorbell Pushers Kitchen accessories Interior finish Coat racks & hooks Handrail holders Door catchers Storm chains Shelf supports Magnetic snappers Safes Bathroom and toilet accessories APRILE DESIGN FORMANI LOCINOX Kit / Glue / PUR/Spray PROJECT DEALS Special offers New products Accessories Gift cards Sale Brands About us Customer service My account EURUSD Nederlands Deutsch English Français