Best prices guaranteed
Money back guarantee
Largest range in Europe
EUR
Dauby

DAUBY TUKAN window handle PH TUKAN /32 - Matt White Bronze (WBS)

Add to wishlist
€119,87 €145,04 Incl. tax per piece
Free shipping
- +
Delivered in: 4-5 days
Europe-wide shipping
Money back guarantee
For private and professional customers
Become a business customer and take advantage of special purchase prices! Click here to request an account.
Description DAUBY TUKAN window handle in Matte White Bronze (WBS), designed by Nicholas Erreweyaert. Timeless Belgian design with a soft, refined appearance.
Article code: 28229

DAUBY TUKAN window handle PH TUKAN /32 - Matt White Bronze (WBS)

The DAUBY TUKAN window handle PH TUKAN /32 is part of the TUKAN collection, designed by Belgian designer Nicholas Erreweyaert . TUKAN brings design back to its essence, with a clear and timeless design in which simplicity, material, and refined proportions take center stage.

The window handle has an elongated, rounded shape and is combined with a compact oval rosette of 36 x 68 mm . The window handle has a total length of 142 mm and a projection of 68 mm . The balanced design ensures a calm and distinctive appearance on the window.

Matte White Bronze (WBS)

This version is finished in Matte White Bronze (WBS) . The light, matte bronze tone gives the window handle a soft and understated appearance, beautifully showcasing the character of the material. This refined finish pairs easily with both modern and timeless interiors.

Combine the TUKAN window handle with matching DAUBY door handles and other hardware from the TUKAN collection in the same finish for a harmonious look.

Technical specifications

Brand Dauby
Collection Tukan
Designer Nicholas Erreweyaert
Product type Window handle
Model PH Tukan /32
Finish Matte White Bronze (WBS)
Rosette dimensions 36 x 68 mm
Axial distance 43 mm
Total length of window handle 142 mm
Length from center of pivot point 108 mm
handle width 18 - 21 mm
Projection 68 mm
Pen 7 mm
Sales unit Per piece
Reviews Read or write a review No reviews found Add your review
Categories
Door handles Door fittings Hinges Furniture handles Door handles Window handles Espagnolettes Doorknobs Door stoppers Security hardware Locks Cylinders Door closers / door pumps
Door closers / door pumps
Back to categories Door closers
Sliding door handles House numbers Sliding door systems Portholes Door latches Pictograms Mailboxes Doorbell Pushers Kitchen accessories Interior finish Coat racks & hooks Handrail holders Door catchers Storm chains Shelf supports Magnetic snappers Safes Bathroom and toilet accessories APRILE DESIGN FORMANI LOCINOX Kit / Glue / PUR/Spray Volume discounts Special offers New products Accessories Gift cards Stock Deals Sale Brands About us Customer service My account EURUSD Nederlands Deutsch English Français