Best prices guaranteed
Money back guarantee
Largest range in Europe
EUR
Dauby

DAUBY TUKAN WC set 50F - Matte Satin white bronze (WBS)

Add to wishlist
€117,74 €142,47 Incl. tax
Free shipping
- +
Delivered in: 4-5 days
Europe-wide shipping
Money back guarantee
For private and professional customers
Become a business customer and take advantage of special purchase prices! Click here to request an account.
Description DAUBY TUKAN WC fitting in Matte White Bronze (WBS), designed by Nicholas Erreweyaert. With 50 mm round rosettes and supplied as a complete set.
Article code: 28965

DAUBY TUKAN WC set 50F - Matte White Bronze (WBS)

The DAUBY TUKAN WC set 50F is part of the TUKAN collection, designed by Belgian designer Nicholas Erreweyaert . TUKAN brings design back to its essence, with a clear and timeless design in which simplicity, material, and refined proportions take center stage.

The WC door fitting consists of two round rosettes with a diameter of 50 mm and features a compact rotary knob that allows the door to be easily locked. The visible fixing complements the pure and distinctive design of the TUKAN collection. The fitting is suitable for WC and bathroom doors.

Matte White Bronze (WBS)

This version is finished in Matte White Bronze (WBS) . The light and matte appearance gives the hardware a soft, understated look that beautifully showcases the character of the material. As a result, this finish combines easily with both modern and timeless interiors.

Combine the TUKAN WC set with matching DAUBY door handles and other door hardware from the TUKAN collection in the same finish for a harmonious whole.

Technical specifications

Brand DAUBY
Collection TUKAN
Designer Nicholas Erreweyaert
Product type toilet set
Model TUKAN 50F
Finish Matte White Bronze (WBS)
Rosette shape Around
Rosette diameter 50 mm
Center distance mounting 38 mm
Rotary knob dimensions 40 x 14 mm
Projection rotary knob 31 mm
Pen 6 - 8 mm
Application WC and bathroom doors
Sales unit Set
Reviews Read or write a review No reviews found Add your review
Categories
Door handles Door fittings Hinges Furniture handles Door handles Window handles Espagnolettes Doorknobs Door stoppers Security hardware Locks Cylinders Door closers / door pumps
Door closers / door pumps
Back to categories Door closers
Sliding door handles House numbers Sliding door systems Portholes Door latches Pictograms Mailboxes Doorbell Pushers Kitchen accessories Interior finish Coat racks & hooks Handrail holders Door catchers Storm chains Shelf supports Magnetic snappers Safes Bathroom and toilet accessories APRILE DESIGN FORMANI LOCINOX Kit / Glue / PUR/Spray Volume discounts Special offers New products Accessories Gift cards Stock Deals Sale Brands About us Customer service My account EURUSD Nederlands Deutsch English Français