Best prices guaranteed
Money back guarantee
Largest range in Europe
EUR
Dauby

DAUBY TUKAN window handle PH TUKAN /DKS - Matte Satin white bronze (WBS) - Lockable

Add to wishlist
€215,76 €261,07 Incl. tax per piece
Free shipping
- +
Delivered in: 4-5 days
Europe-wide shipping
Money back guarantee
For private and professional customers
Become a business customer and take advantage of special purchase prices! Click here to request an account.
Description Lockable DAUBY TUKAN window handle in Matt White Bronze (WBS), designed by Nicholas Erreweyaert. With key for locking the tilt-and-turn window.
Article code: 28236

DAUBY TUKAN window handle PH TUKAN /DKS - Matte White Bronze (WBS) - Lockable

The DAUBY TUKAN window handle PH TUKAN /DKS is part of the TUKAN collection, designed by Belgian designer Nicholas Erreweyaert . TUKAN brings design back to its essence, with a clear and timeless design in which simplicity, material, and refined proportions take center stage.

This version is specifically designed as a lockable window handle for tilt-and-turn windows . The integrated locking mechanism is operated with a key. The window handle features an elongated, rounded grip and a rectangular backplate, giving the whole a sleek and balanced character.

Matte White Bronze (WBS)

This version is finished in Matte White Bronze (WBS) . The light, matte bronze tone gives the window handle a soft and understated appearance, beautifully showcasing the character of the material. The refined finish combines easily with both modern and timeless interiors.

Technical specifications

Brand Dauby
Collection Tukan
Designer Nicholas Erreweyaert
Product type Lockable window handle
Model PH Tukan /DKS
Finish Matte White Bronze (WBS)
Operation Lockable with key
Suitable for Tilt-and-turn window
Shield dimensions 144 x 35 mm
Axial distance 43 mm
Handle length 108 mm
handle width 18 - 21 mm
Total overhang 85 mm
Pen 7 mm
Sales unit Piece
Reviews Read or write a review No reviews found Add your review
Categories
Door handles Door fittings Hinges Furniture handles Door handles Window handles Espagnolettes Doorknobs Door stoppers Security hardware Locks Cylinders Door closers / door pumps
Door closers / door pumps
Back to categories Door closers
Sliding door handles House numbers Sliding door systems Portholes Door latches Pictograms Mailboxes Doorbell Pushers Kitchen accessories Interior finish Coat racks & hooks Handrail holders Door catchers Storm chains Shelf supports Magnetic snappers Safes Bathroom and toilet accessories APRILE DESIGN FORMANI LOCINOX Kit / Glue / PUR/Spray Volume discounts Special offers New products Accessories Gift cards Stock Deals Sale Brands About us Customer service My account EURUSD Nederlands Deutsch English Français