Best prices guaranteed
Money back guarantee
Largest range in Europe
EUR
Dauby

DAUBY TUKAN door handles PH TUKAN /PBTC Q - Matte Satin white bronze (WBS)

Add to wishlist
€212,05 €256,58 Incl. tax Per pair
Free shipping
- +
Delivered in: 4-5 days
Europe-wide shipping
Money back guarantee
For private and professional customers
Become a business customer and take advantage of special purchase prices! Click here to request an account.
Description DAUBY TUKAN door handles on rectangular rosettes in Matte White Bronze (WBS), designed by Nicholas Erreweyaert. Timeless Belgian design with a soft, refined appearance.
Article code: 28173

DAUBY TUKAN door handles PH TUKAN /PBTC 1 - Matte White Bronze (WBS)

The DAUBY TUKAN door handles PH TUKAN /PBTC 1 are part of the TUKAN collection, designed by Belgian designer Nicholas Erreweyaert . TUKAN brings design back to its essence, with a clear and timeless design in which simplicity, material, and refined proportions take center stage.

The door handles have an elongated, rounded shape and are combined with oval rosettes measuring 63 x 28 mm . The handle has a length of 122 mm and a projection of 61 mm . The soft lines of the handle complement the rounded shape of the rosette beautifully, creating a calm and balanced overall look.

Matte White Bronze (WBS)

This version is finished in Matte White Bronze (WBS) . The light, matte bronze tone gives the door handles a soft and understated appearance, beautifully showcasing the character of the material. The refined finish combines easily with both modern and timeless interiors.

The door handles are supplied in pairs . Combine them with matching DAUBY fittings from the TUKAN collection in the same finish for a harmonious look.

Technical specifications

Brand Dauby
Collection Tukan
Designer Nicholas Erreweyaert
Product type Door handles on rosette
Model PH Tukan /PBTC 1
Finish Matte White Bronze (WBS)
Rosette shape Oval
Rosette dimensions 63 x 28 mm
Axial distance 43 mm
Door handle length 122 mm
handle width 18 - 21 mm
Projection 61 mm
Neck diameter 24 mm
Sales unit Pair
Reviews Read or write a review No reviews found Add your review
Categories
Door handles Door fittings Hinges Furniture handles Door handles Window handles Espagnolettes Doorknobs Door stoppers Security hardware Locks Cylinders Door closers / door pumps
Door closers / door pumps
Back to categories Door closers
Sliding door handles House numbers Sliding door systems Portholes Door latches Pictograms Mailboxes Doorbell Pushers Kitchen accessories Interior finish Coat racks & hooks Handrail holders Door catchers Storm chains Shelf supports Magnetic snappers Safes Bathroom and toilet accessories APRILE DESIGN FORMANI LOCINOX Kit / Glue / PUR/Spray Volume discounts Special offers New products Accessories Gift cards Stock Deals Sale Brands About us Customer service My account EURUSD Nederlands Deutsch English Français